Grafton and Berkely
Replacement of Electrical Risers, Laterals, Heating and Hot Water Systems
The existing electrical distribution infrastructure, alongside the current heating and hot water system(s), need to be replaced due to their age and current condition. A feasibility and options appraisal was commissioned from consultant engineers to examine options to replace the heating alongside the required electrical works. They recommended that the current heating should be replaced with electrical storage heaters.
- Value: £2.8million
- Contractor: To be appointed
- Engineers: David Miles Partnership
- Timescale: (in a table below)
- East End Homes Project Manager: Ade Dehinbo
| Scheduled Pre-Construction Phase | November 2026 |
|
Anticipated On-Site Works Start |
Spring 2027 |
| Anticipated Completion | Autumn 2027 |